| Current Projects |
| |
|
|
 |
YS001
60m Conversion Project
24 months
Bangkok |
Originally a 58 metre hydrographic research vessel, YS001 is currently midway through the conversion process into a 60 m luxury yacht in Bangkok. Yacht Solutions secured the project back in 2008 and now their ‘refit team’ is well underway. (read more..) |
| |
|
|
| |
| Previous Projects |
|
|
| |
|
|
 |
|
10 days prior to hauling out in China the yard informed the yacht that they no longer had capacity for the vessel, the captain contacted Yacht Solutions to see whether things could be organised in Thailand. On the 21st January 2007 the yacht entered the dock yard and by the 22nd work was underway to complete a list of works originally scheduled for 4 months with only 10 weeks remaining. (read more..) |
| |
|
|
 |
|
Whilst on a circumnavigation Whale Song a 33m expedition vessel contacted Yacht Solutions to begin preparations for necessary refit work prior to their arrival in Thailand. All possible arrangements were made before the vessel even entered Thai waters to ensure a smooth and efficient transition from cruising yacht to a yacht under refit. (read more..) |
| |
|
|
 |
|
Purchased by its current owner to be used as a charter vessel in local waters, the 110 ft motor yacht is undergoing a major refit. The preparation prior to the vessels arrival from the US ensured the owner had a good idea of the budget required to attain the necessary high standards. (read more..) |
| |
|
|
 |
MY Amoha
40m Motor Yacht
4 months
Phuket |
Purchased by its current owner to be used as a charter vessel in local waters, the 110 ft motor yacht is undergoing a major refit. The preparation prior to the vessels arrival from the US ensured the owner had a good idea of the budget required to attain the necessary high standards. (read more..) |
| |
|
|
 |
|
Shipped from the Mediterranean in October 2009, MY Space is the latest yacht to venture further afield to discover and experience exciting new cruising grounds. Upon arrival in Thailand the vessel was successfully hauled for minor repairs to the bow thruster, re antifouling and general yard work. (read more..) |
| |
|
|
| |
|
|